Hefei Chitherm Equipment Co., Ltd

Hefei Chitherm Equipment Co., Ltd

Manufacturer from China
Verified Supplier
1 Years
Home / Products / High Temperature Box Furnace /

High Temperature Ceramic Drying Furnace Hrf216-07n Max Temp. 700 ordm for Industrial Production

Contact Now
Hefei Chitherm Equipment Co., Ltd
Visit Website
City:hefei
Province/State:anhui
Country/Region:china
Contact Person:Mrzang
Contact Now

High Temperature Ceramic Drying Furnace Hrf216-07n Max Temp. 700 ordm for Industrial Production

Ask Latest Price
Video Channel
Place of Origin :China
Brand Name :Chitherm
MOQ :1
Price :Negotiable
Packaging Details :Customized
Delivery Time :Customized
Payment Terms :Customized
Supply Ability :50 Sets/Year
Model Number :HRF216-07N
Model NO. :HRF216-07N
Range of Applications :Industrial
Type :Electric Holding Furnace
Usage :Ceramic Drying
Heating Element :Stainless Steel Heater
Effective Chamber Dimensions :600*600*600mm(W*H*D)
Rated Temp. :650ºC
Max Temp. :700ºC
Transport Package :Wooden Packaging
Specification :1300*1710*1800mm(W*H*D)
Trademark :Chitherm
Origin :China
HS Code :8514101000
Customization :Available
Certification :ISO
Place Style :Vertical
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description
1. Equipment Name and Model:
HRF216-07N Degumming Furnace


2. Technical Indicators and Basic Configuration
2.1 Rated Temperature: 650ºC;
2.2 Maximum Temperature: 700ºC;
2.3 Effective Size: 600×600×600mm (Width × Height × Depth);
2.4 Material Bearing Method: Stainless Steel Material Tray;
2.5 Furnace Chamber Material: SUS310S;
2.6 Heating Element: Stainless Steel Heater;
2.7 Temperature Control Stability: ±1ºC;
2.8 Platform Temperature Uniformity: ±5ºC (For the platform at 300~600ºC, tested in an empty furnace at a constant temperature for 1 hour);
2.9 Thermocouple Type: K Graduation;
2.10 Temperature Control Instrument: Imported Japanese Intelligent Temperature Controller;
2.11 Number of Temperature Control Segments: 4×16 segments;
2.12 Number of Temperature Control Points: 1 point, controlling the temperature of the working chamber;
2.13 Number of Detection Points: 1 point, monitoring the temperature of the heating chamber;
2.14 Exhaust Chimney: 1 piece, and the size of the exhaust port can be adjusted manually;
2.15 Oxygen Content Detection: Equipped with a micro-oxygen analyzer, which can monitor the oxygen content in the furnace chamber in real time;
2.16 Oxygen Content: The optimal oxygen content can reach 10ppm plus the oxygen content of the gas source;
2.17 Alarm Protection: Audible and visual alarm protection for over-temperature, broken thermocouple, etc.;
2.18 Motor Protection: Over-current protection for the fan;
2.19 Surface Temperature Rise: ≤35ºC;
2.20 Maximum Heating Rate: 5ºC/min;
2.21 Heating Power: 24kW;
2.22 Insulation Power of the Empty Furnace: ≤12kW;
2.23 Equipment Color: Light Gray;
2.24 Total Weight of the Equipment: Approximately 1000kg;
2.25 Reference Dimensions of the External Shape: 1300mm×1710mm×1800mm (Width × Depth × Height, excluding the chimney).


3. Overall Technical Description
The entire oven is mainly composed of the frame structure, the furnace chamber, the furnace door, the hot air circulation system, the atmosphere system, the water cooling system, and the temperature control system.
High Temperature Ceramic Drying Furnace Hrf216-07n Max Temp. 700 ordm for Industrial Production
4. Equipment Handover List
Table 1 Delivery Schedule
Name Main Content Quantity
Basic Composition Main Kiln Furnace Unit 1 set
Inspection Certificate of Conformity Certificates of Conformity for Each Main Outsourced Component 1 set
Technical Documents Instruction Manual, Random Technical Documents of Each Main Outsourced Component, etc. 1 set
Key Components Stainless Steel Heater SUS310S 1 set
Temperature Controller Imported from Japan 1 set
Circulating Fan Fully Water-cooled Sealed Fan 1 set
Spare Parts Solid State Relay 1 piece
Stainless Steel Heater 1 piece


5. Equipment Conditions
5.1 Transportation and On-site Installation of the Equipment
5.1.1 Equipment Transportation Method: Integrated transportation.
5.1.2 Installation Equipment: 1 hydraulic forklift or crane.
5.1.3 Equipment Unloading/Positioning: After the equipment is transported to the customer's site, the customer shall inspect whether the equipment is damaged. If there is no damage, the customer shall be responsible for unloading the equipment to the position designated by the customer.
5.1.4 Preparation before Installation: Before installing the equipment, the customer needs to make relevant preparations in advance. For specific parameters, see (Normal Operating Conditions of the Equipment).
5.1.5 Customer's Responsibilities: Be responsible for the positioning of the equipment at the usage site, including the unloading of the equipment, the wiring of the external wires of the equipment to the main switch of the equipment, and the ventilation system of the factory building (including the air hood, etc.).
5.1.6 Manufacturer's Responsibilities: Be responsible for the on-site assembly of the equipment, the building of the furnace chamber and the functional debugging of the equipment, and assist the buyer in process debugging.
5.2 Normal Operating Conditions of the Equipment
5.2.1 Environmental Conditions: Temperature 0~40ºC, humidity ≤80%RH, no corrosive gases, and no strong air flow disturbance;
5.2.2 Gas Source Conditions: High-purity nitrogen with a purity of 99.999%, inlet pressure of 0.2~0.4Mpa, and gas consumption of 3~7m3/h;
5.2.3 Water Source Requirements: Clean and non-corrosive, water temperature ≤23ºC, inlet water pressure of 0.2~0.4Mpa, and water consumption of 2~6L/min;
5.2.4 Ventilation System: Non-contact access to the user's air extraction system, and the extraction and exhaust capacity is greater than 10m3/h;
5.2.5 Ground Requirements: Level, no obvious vibration, and the load-bearing capacity is >300Kg/ m2;
5.2.6 Power Conditions: Capacity greater than 32KVA, three-phase five-wire, voltage 220/380V, frequency 50Hz.
Live wires: yellow, green, red; neutral wire: blue; ground wire: yellow-green;
Installation Site: 2000mm×3000×3000mm (Width × Depth × Height), and the installation area is greater than 6m2.
High Temperature Ceramic Drying Furnace Hrf216-07n Max Temp. 700 ordm for Industrial ProductionHigh Temperature Ceramic Drying Furnace Hrf216-07n Max Temp. 700 ordm for Industrial ProductionHigh Temperature Ceramic Drying Furnace Hrf216-07n Max Temp. 700 ordm for Industrial Production
Inquiry Cart 0