Hefei Chitherm Equipment Co., Ltd

Manufacturer from China
Verified Supplier
1 Years
Home / Products / Vacuum Muffle Furnace /

Vacuum Muffle Furnace Cwf80-05 Ni-Cr Heating Strip Nitrogen Hydrogen

Contact Now
Hefei Chitherm Equipment Co., Ltd
Visit Website
City:hefei
Province/State:anhui
Country/Region:china
Contact Person:Mrzang
Contact Now

Vacuum Muffle Furnace Cwf80-05 Ni-Cr Heating Strip Nitrogen Hydrogen

Ask Latest Price
Video Channel
Brand Name :Chitherm
Model Number :Cwf80-05
Place of Origin :China
MOQ :1
Price :Negotiable
Payment Terms :Customized
Supply Ability :50 Sets/Year
Delivery Time :Customized
Packaging Details :Customized
Type :Electric Holding Furnace
Usage :Steel Molding
Fuel :Electric
Atmosphere :Vacuum/Nitrogen/Hydrogen
Effective Chamber Dimensions :400*400*500mm(W*H*D)
Transport Package :Wooden Packaging
Specification :1800*2000*1800mm(W*H*D)
HS Code :8514101000
Place Style :Vertical
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Vacuum Muffle Furnace Cwf80-05 Ni-Cr Heating Strip Nitrogen Hydrogen

Overview
The CWF80-05 vacuum chamber furnace is suitable for medium-temperature heat treatment of electronic products, primarily used for sintering processes of related materials in nitrogen or hydrogen atmospheres. The furnace is fully equipped with a real-time computer monitoring system, making it particularly suitable for material process testing requirements in research institutes.

Vacuum Muffle Furnace Cwf80-05 Ni-Cr Heating Strip Nitrogen Hydrogen

Performance Parameters
Product Model: CWF80-05
Operating Temperature: 400°C
Maximum Temperature: 500°C
Effective Chamber Size: 400×400×500mm (W×H×D)
Heating Element: Ni-Cr heating strip
Processing Atmosphere: Nitrogen, Hydrogen
Cooling Method: Full water-cooled outer wall
Number of Temperature Control Points: 3
Number of Temperature Control Segments: 20 steps
Temperature Stability: ±1°C, with PID parameter self-tuning function; Temperature Accuracy: ±10°C
Temperature Uniformity: ±5°C (tested at 400°C for 1 hour in an empty furnace), with reserved inspection ports
Control Method: Touch screen + PLC centralized control
Alarm Protection: Audible and visual alarms for over-temperature, broken thermocouples, low water pressure, and insufficient vacuum level
Surface Temperature Rise: ≤35°C
Design Power: 30kW
Installed Power: Approximately 50kW
Power Supply Requirements: Capacity greater than 70kVA, 3-phase 5-wire, voltage 220/380V, frequency 50Hz
External Dimensions: 1800×2000×1800mm (W×H×D)


3. Facility Requirements
  1. Environmental Conditions: temp.: 0~40ºC, humidity ≤ 80%RH, no corrosive gas, no strong airflow disturbance
  2. N2 Conditions: 99.999% purity, working pressure: 0.2-0.4MPa, Max gas consumption 2-6 m3/h
  3. Water inflow conditions: 0.15~0.3Mpa,Clean, No Corrosion, Supply flow 2t/h
  4. Compressed Air Condition: dry, clean, oil-free, working pressure: 0.4-0.8MPa
  5. Water Conditions: clean, no corrosive water, working pressure 0.1-0.3MPa, 3-9L/min
  6. Ventilation System: non-contact access to the user pumping system, pumping capacity is greater than 15m3/h
  7. Ground Requirements: horizontal, no obvious vibration, load-bearing> 500 kg/m2;
  8. Power Condition(TBD): capacity >70kVA, 3-phases 5-lines, voltage 220/380V, frequency 50Hz. Fire line: yellow, green, red, Zero line: blue, Ground line: yellow-green;
  9. Installation Site: 2500mm×2500mm×3000mm(D×W×H), with an installation area greater than 7m2.


Inquiry Cart 0